Exterior
Power washing $3.00 - $6.00 per sq.ft.
Sand blasting $6.00 - $12.00 per sq.ft.
Grinding and coring $6.00 - $12.00 per sq.ft
Brick replacement $30.00 - $45.00 per sq. ea
Repoint exterior wall (soft mortar) $15.00 - 20.00 per sq.ft. (min. $500)
Repoint exterior wall (hard mortar) $15.00 - $25.00 per sq.ft. (min. $500)
Parge foundation walls $5.00 - $9.00 per sq.ft.
Dampproof foundation walls and install weeping tile $150.00 - $300.00 per lin.ft. (min. $3000)
Install a deck $45.00 - $50.00 per sq.ft. (min. $1000)
Resurface existing asphalt driveway $3.00 - $6.00 per sq.ft.
Install interlocking brick driveway $18.00 - $26.00 per sq.ft.
Rebuild exterior basement stairwell $10000.00 and up
Build detached garage $70.00 - $140.00 per sq.ft.
Build retaining wall (wood) $20.00 - $40.00 per sq.ft. (min. $500)
Build retaining wall (concrete) $30.00 - $60.00 per sq.ft. (min $500)
Painting (trim only) $2000.00 - $4000.00 and up
Painting (trim and wall surfaces) $5000.00 and up
Epoxy Coatings $15.00 - $25.00 per sq.ft.
Epoxy Injections $100.00 - $300.00 per lin.ft.
Exterior insulation finish system $15.00 - $35.00 per sq.ft.
Sealant Replacement $10.00 - $30.00 per lin.ft.
Install galvanized or aluminum gutters and downspouts $5.00 - $10.00 per lin.ft. (min. $500)
Install aluminum soffits and fascia $10.00 - $16.00 per lin.ft.
Install aluminum or vinyl siding $10.00 - $18.00 per sq.ft.
Structure
Underpin one corner of house $5000.00 and up
Underpin or add foundations $300.00 and up per lin.ft. (min. $3000)
Lower basement floor by underpinning and/or bench footings $150.00 - $300.00 per lin.ft. (min. $5000)
Replace deteriorating sill beam with concrete $60.00 and up per lin.ft. (min. $2000)
Install basement support post with proper foundation $800.00 - $1600.00
Perform chemical treatment for termites $2000.00 and up
Repair minor crack in poured concrete foundation $400.00 - $800.00
Roofing / Flashings / Chimneys
Install conventional asphalt shingles over existing shingles $5.00 - $9.00 per sq.ft.
Strip and reshingle with conventional asphalt shingles $5.75- $9.50 per sq.ft.
Strip and reshingle with premium quality asphalt shingles $10.00 - $15.00 per sq .ft.
Strip and re-roof with cedar shingles $9.00 - $18.00 per sq .ft.
Strip and replace built-up tar and gravel roof $10.00 - $20.00 per sq.ft. (min. $1000)
Strip and replace single-ply membrane $10.00 - $20.00 per sq.ft. (min. $1000)
Reflash typical skylight or chimney $500.00 - $1000.00
Rebuild typical chimney above roof line $25.00 - $50.00 per row of bricks (min. $400)
Rebuild typical single flue chimney above roof line $200.00 - $400.00 per lin.ft. (min. $1000)
Epoxy Coatings concrete roof deck $15.00 - $25.00 per sq.ft.
Interior
Grinding and coring $8.00 - $14.00 per sq.ft
Add drywall over plaster $4.00 - $8.00 per sq.ft.
Install replacement windows $40.00 - $120.00 per sq.ft.
Install storm window $200.00 - $400.00
Install masonry fireplace (if flue already roughed-in) $3000.00 and up
Painting (trim only) $2000.00 - $4000.00 and up
Painting (trim and wall surfaces) $5000.00 and up
Epoxy Coatings $25.00 - $45.00 per sq.ft.
Epoxy Injections $100.00 - $300.00 per lin.ft.
Waterproofing foundation walls and install weeping tile $150.00 - $200.00 per lin.ft. (min. $3000)
Daily Service Charge - min. $1500.00
Daily Permited Service Charge - min. $3000.00
Daily Delay Charge - min. $500 - $1500.00
Fuel Charge - $0.61 per KM
Daily Winter heating & tarping - per unit min. $500.00
Daily Site Services, water&power- per service min. $500.00
Daily Access Equipment Charge - per unit min. $500.00
Daily Labour Cost
Project Manager - min $120.00 - $150.00 per hour
Certified Labour Site Supervisor / Competent Person- min 100.00 - $110.00 per hour
Certified Labour Journerman - $95.00 per hour
Certified Labour Tradesman - $85.00 per hour
Certified Labourer - $85.00 per hour
Labourer - $80.00 per hour
Helper - $60.00 per hour
Profit - %10
Overhead - %10
Over due account charge - %3
as of Jan 1, 2022 will be increased by inflation rate Jan 1, 2023
Image Masonry Ltd. states prices and percentages may vary with complexity and size of the project.